EIA For 25MW Power Plant at Agodi, Ibadan, Oyo State
Client Entec Power and Utilities Limited
Project Manager Bartholomew Ndulue
Project Location Ibadan, Oyo State, Nigeria

Environmental Impact Assessment for a 25MW Power Generating Plant in Agodi, Ibadan North Local Government, Oyo State, Nigeria

This EIA was implemented for a 25MW Gas Power Generating Plant in Ibadan, Nigeria. The proposed plant would involve delivery and installation of ten (10) units of JGS 620 GS-N.L-F13 Reciprocating Engines. Each engine unit with installed capacity of 3.044MW. The Engines will be powered by natural gas supplied by Nigeria Gas Company (NGC) through the Escravos-to-Lagos (ELP) Gas Pipeline System teeing off at Ibafo area of Ogun State. 

The EIA was managed by Mr. Bartholomew Ndulue, presently a member of EcoPro team, on behalf of Triple 'E' Systems Associates Limited.   
 